Sawaed 104
21 Apr 2025

Sawaed Real Estate Al Hamra 104 Project

1%OverallFirst visit — no previous comparison.

Engineering Report

Actual site work has commenced for the Sawaed 104 project, with current activities focused on the preliminary preparation and excavation phase. Site fencing with identification signage has been completed, and heavy machinery has begun leveling, preliminary excavation, and the removal of debris resulting from land preparation.
Detected changes
Site General Layout and Facilities100%

Temporary site fencing and project identification signage have been installed, with heavy machinery (excavator) mobilized on-site to commence work.

Excavation and Soil Works95%

Mechanical excavation works have begun with soil stockpiling in designated areas, alongside the handling of old concrete remains discovered during site preparation.

Progress reading

The visible works confirm that the project is in its baseline stages. Images 1 to 5 are 3D renders of the final design, while images 6 to 14 reflect the current construction reality, which is limited to excavation and site preparation works.

vs previous visit

No previous visit available for comparison

Expected next milestones

Completion of excavation to the required level, debris removal, and commencement of concrete pouring for the foundations.

Progress

0%OverallAverage item progress
0/5 complete
أعمال الحفرnew
0%
أعمال الخرساناتnew
0%
أعمال التشطيبnew
0%
أعمال الكهرباءnew
0%
أعمال السباكةnew
0%